Budget/Credits
Research & Labor
 
- 3 People 20 hours/week for 40 weeks - 48000
 
- Industrial Designer for 20 hours (@100/h) - 2000
 
- Construction labor (via a contractor) - 5000
 
- Average work hour calculated as 60
 
- 11800
 
Equipment
 
- Misc. RF research - university resource
 
- A computer tha would work as brain of the system. - 2500
 
- Three video cameras - 1500
 
- Misc. testing supplies - 300
 
- Visual DSP++ - 2625 (University Resources?)
 
- Paging channel analysis software
 
- 6925
 
Development
 
- Base Tower Physical Construction:
 
- Mount, location construction - Site Dependant
 
Materials
 
- DSP Processor (ADSP-TS101SAB1-000) - 400
 
- Antenna - 100
 
- Connectivity (Serial Devices) - 30
 
- Misc. and Fabrication - 400
 
- Large aluminum sheets, piano strings, wood blocks, etc. -  2000
 
- Boards, chips and cotrollers to trigger the instruments. - 1500
 
- Pipes & reflectors - 500
 
- Polyester & epoxy resins for 6 seats + extras - 500 PVC - 1500
 
- LED arrays (aprox 1500 p/seat) total - 9000
 
- 17430
 
Misc
 
- Cables, books, journals, tools, etc. - 5000
 
- 5000
 
 Total (all prizes in us-dollar) 55000
Concept
 
- Jorge Castellanos, Anne Pascual, Will Wolcott
 
 Development 
 
- Jorge Castellanos (Sound)
 
- Anne Pascual (Visual Objects)
 
- Will Wolcott (Tracking Device)
 
 
 
- wave spot - a project by Jorge Castellanos, Anne Pascual, Will Wolcott